Project: Southampton High School
Location: Southampton, New York
Completion: December 2011
Description: High School Renovation

Scope:

  • List Industries Lockers, Corridor and Athletic
  • Draper Athletic Equipment
  • Hussey MAXAM Bleachers
  • Campbell Rhea Science Lab Casework
  • Palmer Hamilton Food Court

Summary: Construction began in 2008 after the passing of a district wide bond. The first phase of construction included a new four bank 18 tier telescopic bleacher in the main gym.  A mix 621 single and double tier Marquis Champion lockers were put into the boys, girls and the varsity team locker rooms. All of the schools 9 science labs we redone with new wood casework, fume hoods, lab tables, and teacher display tables. During the school year, all corridor lockers were replaced with 400 double tier Marquis Booksafe All Welded Lockers, with no disturbance to the students or school. A new auxiliary gym was built that was outfitted with two 7 tier telescopic bleacher, basketball backstops, scoreboard and shot clocks, baseball batting cages, and wall pads. Lastly, the school cafeteria was outfitted in a food court design featuring traditional cafeteria tables but also high tops and booths screened with the school logo.

Bleachers NY Gym Equipment NY School Lockers Bleachers New York Cafeteria Furniture Science Furniture Science Furniture